Skip to content

sandbox phase 7 (UI): pipeline rail + polish #123

@William-Hill

Description

@William-Hill

Parent: #116 · Spec: docs/superpowers/specs/2026-05-02-sis-pdp-ar-sandbox-design.md

Scope

  • Persistent horizontal rail at the top of every /sandbox/* page: SIS ── PDP ── AR ── Dashboard with state dots (filled / outlined / disabled).
  • Rail is nav + breadcrumb + lineage in one component. Hover any stage shows last activity for current institution.
  • One delight animation: a single gold-accent token travels left-to-right along the rail when a transformation runs.
  • Final polish pass: typography, spacing, hover states, empty states, keyboard nav.

Acceptance

  • Rail mounted on every /sandbox page
  • Hover on each stage shows last upload metadata
  • Transformation token animates exactly once per submit (no loop)
  • Lighthouse a11y ≥ 95 on all sandbox routes

Estimate: 2 days. Depends on phases 4–6.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions